Commissioning questions, answered in your documented order.
When a commissioning stage is unclear, or the right page is in another manual, the installer rings your technical line. Lingo turns your commissioning procedure into guides your team approves, so installers work through it stage by stage, and ask for a person when a stage needs one.
Lingo
Online
GUIDE · COMMISSIONING
- QUESTIONWhich variant is fitted?
- QUESTIONIs the stage before complete?
- FIXThe steps for the next stage, numbered
- ROUTE TO HUMANWhen the installer asks for a person
Commissioning is already written down. Following it on site is the hard part.
Standards and trade bodies expect a documented procedure, and your manuals set one out. When a stage is unclear or the right page is in another document, the installer rings your technical line.

Heat pumps
The UK MCS installation standard (MIS 3005-I, 2025) says a system “shall be commissioned according to a documented procedure”, and that the checklist can be the manufacturer’s own.

Industrial doors
The Door & Hardware Federation says a CE- or UKCA-marked door is still force tested on installation: a stage of the job with its own place in the order.
Heat pumps
Two manuals for one job
One heat pump range keeps its commissioning checklist and system configuration in the controller manual, not the heat pump manual.
Heat pumps
A helpdesk for exactly this
One major heat pump manufacturer in the UK runs its technical helpdesk for “on-site issues with commissioning or diagnosing faults”.
Each stage opens with a question. The answer decides what comes next.
A guide puts your stages in the order your manual gives. Before each one it asks whether the stage before is complete. “Not yet” sends the installer back to the steps still to be done.
QuestionIs the installation ready to power up?
1Checks before first power-up
QuestionAre the checks before power-up complete?
2First power-up
Not yet: back to stage 1
QuestionHas the unit powered up as your manual describes?
3Settings for this variant
Not yet: back to stage 2
QuestionAre the settings entered?
4Tests and measurements
Not yet: back to stage 3
QuestionAre the tests complete and recorded?
5Handover
Not yet: back to stage 4
The same job in three industries.
The kind of message that reaches a technical line during commissioning, and what an approved guide does with it.
Heat pumps
What order do I commission this system in?
- Why it reaches you now
- The commissioning steps, the controller settings and the checklist can sit in different documents for one range.
- The approved guide
- Asks which unit and controller are fitted, then takes the installer through your stages, each opened by a question.
- When it goes to a person
- A design question, such as what the system needs for this house, or a reading the procedure does not cover.
- For your team
- The guide carries the order of the procedure. A person is asked about a stage only when the installer requests one.
Fire suppression
What checks come before the system is armed?
- Why it reaches you now
- The sequence is set in the commissioning manual, and on a life-safety system a missed check matters.
- The approved guide
- Confirms the panel and system, then sends the checks your commissioning manual sets before arming, in its order.
- When it goes to a person
- Work on the release circuit, or a check that does not give the result the manual expects.
- For your team
- The engineers you approved get your published sequence; your team decides where each guide stops.
Industrial doors
Door’s commissioned. What do I do before handover?
- Why it reaches you now
- Handover checks can be spread across the control manual and the safety device documents.
- The approved guide
- Sends the handover checks from your documents, and says that force testing is due at that point in the job.
- When it goes to a person
- Anything that depends on the site: risk assessment, third-party safety devices or modifications.
- For your team
- Questions about where the handover checks are written can be answered from the guide.
Your procedure, published by your team.
What gets a guide
Which stages get a guide, how each gate question is worded and where a guide hands over to a person.
Who can use it
The phone numbers you approve, added one at a time or imported as a list.
What is kept
Each conversation, with the installer’s name and number, the product, the guide used and the answer given at each stage.
What stays with the installer and your paperwork
- Tests and measurements: the guide says one is due, the installer carries it out and answers.
- The order on site: the guide gives your stages one at a time, and the installer works through them.
- What is fitted: Lingo works from what the installer tells it, on any phone.
- Certification: your commissioning certificate stays your record; the conversation sits beside it.

What it takes to start.
- 1
Send the documents for one product
The commissioning chapter or checklist for one product, with the controller or settings manual it refers to.
- 2
See your own draft guides
Lingo drafts a guide for each task. We go through the drafts with you in a 15-minute walkthrough.
- 3
Your team checks and publishes
Checking each draft against the manual is the main work. Your team corrects it and publishes it, and can edit or unpublish it at any time.
- 4
Start with people you choose
Approve the installers who commission most often, and widen it once your team has checked a few weeks of conversations.
Sources, read 8 October 2026: MCS, MIS 3005-I Heat Pump Installation Standard, issue 1.0 (2025); the Door & Hardware Federation’s industrial doors FAQ; installer manuals and the technical support page of two heat pump manufacturers.
Questions manufacturers ask about commissioning
How does a guide keep installers to our documented order?
A guide puts the stages in the order your manual gives and opens each one with a question, such as whether the stage before is complete. The installer’s answer decides what comes next: the numbered steps for that stage, or the steps for the earlier stage still to be finished.
What record is kept of a commissioning conversation?
Each conversation is kept with the installer’s name and number, the product and the guide used. Your team can read back which guide an installer was taken through and what they answered at each stage.
Our procedure differs between variants. Can one product cover that?
Yes. Guides ask which variant is fitted and branch on the answer. Your team checks each branch against the manual before it is published, and words the question so an installer can answer it from the product in front of them.
Related use cases
Use case
Parameter configuration
The documented setting for the variant fitted and the result wanted.
More on parameter configurationUse case
Wiring and connections
The documented connection steps for the accessory and variant fitted.
More on wiring and connectionsUse case
Fault codes
The manual’s checks for a fault indication, then a handover to your team.
More on fault codes
Send us one commissioning manual.
We’ll convert it and show you your own guide in a 15-minute walkthrough.