Book a walkthrough
English

Commissioning questions, answered in your documented order.

When a commissioning stage is unclear, or the right page is in another manual, the installer rings your technical line. Lingo turns your commissioning procedure into guides your team approves, so installers work through it stage by stage, and ask for a person when a stage needs one.

Lingo

Online

Installer: Commissioning a Model A
Lingo: Which variant of Model A is fitted? 1. Standard 2. With expansion module
Installer: 1
Lingo: Have the checks before first power-up been completed? 1. Yes 2. Not yet
Installer: 2
Lingo: 1. Complete the checks before first power-up. 2. Record the result as your manual asks. 3. Come back here for the next stage.

GUIDE · COMMISSIONING

  1. QUESTIONWhich variant is fitted?
  2. QUESTIONIs the stage before complete?
  3. FIXThe steps for the next stage, numbered
  4. ROUTE TO HUMANWhen the installer asks for a person

Commissioning is already written down. Following it on site is the hard part.

Standards and trade bodies expect a documented procedure, and your manuals set one out. When a stage is unclear or the right page is in another document, the installer rings your technical line.

A heating engineer sets a wall-mounted controller beside new pipework, with his phone in his other hand.

Heat pumps

The UK MCS installation standard (MIS 3005-I, 2025) says a system “shall be commissioned according to a documented procedure”, and that the checklist can be the manufacturer’s own.

Two door engineers commission a sectional door. One presses the button on the control station while the other, holding a clipboard, watches the door.

Industrial doors

The Door & Hardware Federation says a CE- or UKCA-marked door is still force tested on installation: a stage of the job with its own place in the order.

  • Heat pumps

    Two manuals for one job

    One heat pump range keeps its commissioning checklist and system configuration in the controller manual, not the heat pump manual.

  • Heat pumps

    A helpdesk for exactly this

    One major heat pump manufacturer in the UK runs its technical helpdesk for “on-site issues with commissioning or diagnosing faults”.

Each stage opens with a question. The answer decides what comes next.

A guide puts your stages in the order your manual gives. Before each one it asks whether the stage before is complete. “Not yet” sends the installer back to the steps still to be done.

  1. QuestionIs the installation ready to power up?

    1

    Checks before first power-up

  2. QuestionAre the checks before power-up complete?

    2

    First power-up

    Not yet: back to stage 1

  3. QuestionHas the unit powered up as your manual describes?

    3

    Settings for this variant

    Not yet: back to stage 2

  4. QuestionAre the settings entered?

    4

    Tests and measurements

    Not yet: back to stage 3

  5. QuestionAre the tests complete and recorded?

    5

    Handover

    Not yet: back to stage 4

The same job in three industries.

The kind of message that reaches a technical line during commissioning, and what an approved guide does with it.

  • Heat pumps

    What order do I commission this system in?

    Why it reaches you now
    The commissioning steps, the controller settings and the checklist can sit in different documents for one range.
    The approved guide
    Asks which unit and controller are fitted, then takes the installer through your stages, each opened by a question.
    When it goes to a person
    A design question, such as what the system needs for this house, or a reading the procedure does not cover.
    For your team
    The guide carries the order of the procedure. A person is asked about a stage only when the installer requests one.
  • Fire suppression

    What checks come before the system is armed?

    Why it reaches you now
    The sequence is set in the commissioning manual, and on a life-safety system a missed check matters.
    The approved guide
    Confirms the panel and system, then sends the checks your commissioning manual sets before arming, in its order.
    When it goes to a person
    Work on the release circuit, or a check that does not give the result the manual expects.
    For your team
    The engineers you approved get your published sequence; your team decides where each guide stops.
  • Industrial doors

    Door’s commissioned. What do I do before handover?

    Why it reaches you now
    Handover checks can be spread across the control manual and the safety device documents.
    The approved guide
    Sends the handover checks from your documents, and says that force testing is due at that point in the job.
    When it goes to a person
    Anything that depends on the site: risk assessment, third-party safety devices or modifications.
    For your team
    Questions about where the handover checks are written can be answered from the guide.

Your procedure, published by your team.

  • What gets a guide

    Which stages get a guide, how each gate question is worded and where a guide hands over to a person.

  • Who can use it

    The phone numbers you approve, added one at a time or imported as a list.

  • What is kept

    Each conversation, with the installer’s name and number, the product, the guide used and the answer given at each stage.

What stays with the installer and your paperwork

  • Tests and measurements: the guide says one is due, the installer carries it out and answers.
  • The order on site: the guide gives your stages one at a time, and the installer works through them.
  • What is fitted: Lingo works from what the installer tells it, on any phone.
  • Certification: your commissioning certificate stays your record; the conversation sits beside it.
An engineer stands at a newly installed hot water cylinder and controller with the commissioning checklist on a clipboard.

What it takes to start.

  1. 1

    Send the documents for one product

    The commissioning chapter or checklist for one product, with the controller or settings manual it refers to.

  2. 2

    See your own draft guides

    Lingo drafts a guide for each task. We go through the drafts with you in a 15-minute walkthrough.

  3. 3

    Your team checks and publishes

    Checking each draft against the manual is the main work. Your team corrects it and publishes it, and can edit or unpublish it at any time.

  4. 4

    Start with people you choose

    Approve the installers who commission most often, and widen it once your team has checked a few weeks of conversations.

Sources, read 8 October 2026: MCS, MIS 3005-I Heat Pump Installation Standard, issue 1.0 (2025); the Door & Hardware Federation’s industrial doors FAQ; installer manuals and the technical support page of two heat pump manufacturers.

Questions manufacturers ask about commissioning

How does a guide keep installers to our documented order?

A guide puts the stages in the order your manual gives and opens each one with a question, such as whether the stage before is complete. The installer’s answer decides what comes next: the numbered steps for that stage, or the steps for the earlier stage still to be finished.

What record is kept of a commissioning conversation?

Each conversation is kept with the installer’s name and number, the product and the guide used. Your team can read back which guide an installer was taken through and what they answered at each stage.

Our procedure differs between variants. Can one product cover that?

Yes. Guides ask which variant is fitted and branch on the answer. Your team checks each branch against the manual before it is published, and words the question so an installer can answer it from the product in front of them.

Send us one commissioning manual.

We’ll convert it and show you your own guide in a 15-minute walkthrough.