Commissioning and controller questions, answered from your own manuals.
When a commissioning step is unclear, the installer rings your technical line. Lingo turns your installation and controller manuals into guides your team approves, so the routine answers reach site without a call and your support staff stay on the questions that need them.
Lingo
Online
Setting up weather compensation
PublishedQUESTION
Which controller is fitted?
ANSWERS
- 1.The wall-mounted controller
- 2.The controller on the indoor unit
FIX
1. Open the installer settings. 2. Find the weather compensation page. 3. Enter the curve from the system design. 4. Save, then check it is switched on.
Commissioning steps, installer menus and fault tables sit in different manuals.
Commissioning steps, installer menus and fault tables sit in different documents, and the controller changes which page applies. That is why a routine setup question becomes a call.
292 pages
in one manufacturer’s current installer reference guide. Its configuration chapter alone runs to 92 of them.
2 manuals
for one commissioning job on another range. Its checklist and system configuration are in the controller manual, not the heat pump manual.
“On-site issues with commissioning or diagnosing faults”
What one major manufacturer’s technical helpdesk is there for. It stays open longer from October to March.

In some cases, contacting the manufacturer to resolve queries through the technical support was also time consuming.
Reported by the project’s delivery contractors, who installed 742 heat pump systems in 2020 and 2021. The same report notes that accessing up-to-date documentation “can be a challenge when manufacturers have thousands of product lines”.
Routine questions get the answer your team approved. Anything else reaches your team with the conversation so far.
Installer at the unit
Messages your Lingo number
From a phone number you have approved, on WhatsApp, Teams, web or email.
Lingo
Confirms the model and controller
Each product has its own guides, so the steps match the unit fitted.
Your approved guide
Sends the documented steps
One at a time, in the order your manual gives, as your team published them.
Answered
Finished on site
The conversation is kept with the product and the guide used.
Handed over
Your team picks it up
The installer asks for a person. In the hours you set, your team replies in the same conversation with the earlier messages in front of them.
Repeat setup questions go to a guide. Judgement stays with your engineers.
The MCS installation standard already expects a system to be “commissioned according to a documented procedure”. A guide takes the installer through yours.
A guide can take
- The commissioning sequence, one stage at a time, from your checklist
- Weather compensation set-up on the controller fitted
- Where an installer setting sits, and the order your manual gives for changing it
- What a fault indication means on this model, and the checks your manual lists
- What to set and record before handover
Your engineers keep
System design
Heat loss, emitter sizing and design flow temperature sit under MCS’s design standard, not in a product manual.
Refrigerant circuit work
Manufacturers restrict it to qualified refrigeration engineers. A guide can stop at that point and hand over.
Optimisation after handover
The trial’s optimisation report found it “generally requires expert involvement”.
A fault that comes back
If it is still there after the documented checks, someone needs to look at the system.
Three questions installers send from site.
Each step a guide sends back comes from your own manuals.
Weather compensation
How do I set the weather compensation on this controller?
- Why it reaches you now
- The setting sits in the installer menus and differs by controller. The trial’s optimisation report calls poor control of the curve “one of the most common and easily rectified causes of lower efficiency”.
- The approved guide
- Asks which controller is fitted, then sends your documented steps for entering the curve from the system design.
- When it goes to a person
- What the curve should be for this house. That is a design question, so the guide hands it over.
- For your team
- Menu steps you have already documented come from the guide, not from a call to your support staff.
Fault at commissioning
Flow fault on the display at commissioning. What do I check?
- Why it reaches you now
- One manufacturer’s manual notes that a flow fault is common during commissioning. Its fault table already pairs each fault with a diagnosis method and a solution.
- The approved guide
- Confirms the model, then sends the checks from your fault table in the order given.
- When it goes to a person
- The fault is still showing after the documented checks, or the next remedy is on the refrigerant side.
- For your team
- If it reaches your team, the conversation shows which documented checks were sent.
Commissioning checklist
Where’s the commissioning checklist for this range?
- Why it reaches you now
- On some ranges the checklist and system configuration are in the controller manual, and the installer on site has the other one.
- The approved guide
- Takes the installer through your checklist a stage at a time, from the documents you sent for that range.
- When it goes to a person
- A reading or a site condition the checklist does not cover.
- For your team
- A question that is only about finding the right page can be answered from the guide.
Alongside your installer app and remote monitoring.
Several manufacturers already give installers an app, a fault code finder or remote access to the unit’s data. Lingo does not read anything from the unit. It works from what the installer tells it, on any phone, so it also covers older ranges and units without a connection.
You publish every guide
Nothing reaches an installer until your team has checked the draft against the manual and published it.
You choose who can use it
Access can be limited to the phone numbers you approve, which keeps homeowners out of installer-level settings.
You see every conversation
Each one is kept with the installer’s name and number, the product and the guide used.
You set the hours for people
Guides answer at any hour. A request for a person reaches your team in the hours you set; outside them, the installer gets your out-of-hours message.

What it takes to start.
- 1
Send the documents for one product
The installation manual, the controller manual and the fault table for one range, with any service bulletins.
- 2
See your own draft guides
Lingo drafts a guide for each task. We go through the drafts with you in a 15-minute walkthrough.
- 3
Your team checks and publishes
Checking each draft against the manual is the main work. Your team corrects it and publishes it, and can edit or unpublish it at any time.
- 4
Start with people you choose
Approve a first group of installers. Each conversation shows which questions the guides are taking and which still reach your team.
Questions heat pump manufacturers ask
Can we keep homeowners out?
Yes. Access can be limited to phone numbers you approve, added one at a time or imported as a list.
Can it cover ranges we no longer sell?
Yes, where the documents exist. Each product has its own guides, and the installer is asked which product they have.
What happens when an installer asks something no guide covers?
They can ask for a person at any point. Your team is notified by email and replies in the same conversation, in the hours you set. They can then add the answer to a guide.
How much work is it for our team?
Checking drafts against the manual is the main work. Your team corrects and publishes each guide, and chooses which tasks to start with.
How is it priced?
By the number of products you support, from £500 a month for five products. There is no setup fee, and no limit on installers or conversations.
Related use cases
Use case
Commissioning and setup
Your commissioning procedure as ordered questions and steps.
More on commissioning and setupUse case
Parameter configuration
The documented setting for the variant fitted and the result wanted.
More on parameter configurationUse case
Fault codes
The manual’s checks for a fault indication, then a handover to your team.
More on fault codes
Further reading
Article
How Lingo turns a manual into a guide
Read the articlePricing
Priced by the number of products you support
See pricing
Sources, read 8 October 2026: installer manuals and support pages from three manufacturers; Electrification of Heat demonstration project: Home Surveys and Install Report (LCP Delta for BEIS, December 2022) and the project’s optimisation report (DESNZ, December 2024); MCS, MIS 3005-I, issue 1.0 (2025), and MIS 3005-D, issue 2.0 (2025).
Send us one installation manual.
We’ll convert it and show you your own guide in a 15-minute walkthrough.